CariDotMy

 Forgot password?
 Register

ADVERTISEMENT

View: 1286|Reply: 0

How fine aggregate concrete pump inspection after construction ?

[Copy link]
Post time 3-9-2015 09:33 AM | Show all posts |Read mode
Fine Stone Concrete Pumpcommodity iscurrently a very common commodity concrete transportation equipment, mainly forconstruction characteristics and developed warm . Since warm engineeringfilling layer or mortar filling layer can be a large area , high-efficiencyconstruction , so the majority of the construction unit of the pro-Lai. So howfine stone after commodity concrete pump construction inspections?
1, first purged with compressed air or highpressure washing, after washing if not carried out within two days pumpingoperations can be progressively dismantled tube , then water inside and outsidethe tube , clamps and seals and other clean .
2 , after the delivery is completedcomprehensive inspection of all fittings once , then according tospecifications and soundness are to be stored properly .
3, the hopper , valve boxes , concretetanks and pumps to wash the outside , to ensure clean.
4 , dry cover and water , check theelectrical box electrical box on the presence or absence of water, and betreated accordingly .
5 , cut off the power , remove the cable ,remote control lines, while checking the various components , to see whetherthe damage.
6 , deal with problems found duringoperation , while the use of a random tool to clean up and maintenance , andthen with a fine stone goods Concrete pump thatch be shielded .


Reply

Use magic Report

You have to log in before you can reply Login | Register

Points Rules

 

ADVERTISEMENT



 

ADVERTISEMENT


 


ADVERTISEMENT
Follow Us

ADVERTISEMENT


Mobile|Archiver|Mobile*default|About Us|CariDotMy

30-11-2024 08:48 AM GMT+8 , Processed in 0.049776 second(s), 16 queries , Gzip On, Redis On.

Powered by Discuz! X3.4

Copyright © 2001-2021, Tencent Cloud.

Quick Reply To Top Return to the list