View: 1603|Reply: 20
|
[Dunia]
Tanda akhir zaman: Dubai bina empangan hydro di padang pasir untuk jana elektrik. Kita macam biasa cancel untuk jimat kos.
[Copy link]
|
|
Edited by kluangman at 30-1-2023 08:14 AM
https://www.thestar.com.my/news/nation/2019/01/23/telom-dam-project-was-scrapped-last-oct-says-environment-minister
https://www.andritz.com/hydro-en/hydronews/hn33/hatta-dubaiHydro Power from the DesertDubai, HattaThe fascinating Emirate of Dubai, part of the United Arab Emirates, is about to turn a first-of its-kind hydro project into a reality.
© unsplash.com / Fabian Struwe
The challengeThe Dubai Supreme Council of Energy formulated a strategic objective to diversify the Emirate’s energy mix and to enhance sustainability through a program of clean energy development. This plan envisages increasing the clean energy share of the generation mix to 7% by 2020, 25% by 2030, and 75% by 2050. To achieve this ambitious target the Dubai Energy and Water Authority (DEWA) decided to increase the power generation contribution from sources like photovoltaic solar and wind. But, in addition, to also create the necessary energy storage capacity required to balance these volatile renewable energy sources. Further investigation determined that in regions with hot ambient conditions, pumped storage technology is superior to battery technology. Batteries are sensitive to heat and, as a result, a utility-scale battery storage facility would require a tremendous amount of electricity for cooling purposes.
One third of the Earth’s surface is arid or semi-arid. It is the world’s major landscape type and is still suitable for hydropower development.
The ConceptNear the community of Hatta, approximately 140 km southeast of Dubai in the Hajar Mountains on the northern border with the Sultanate of Oman, there is an existing reservoir created by the Sadd Hatta Al Awwal Dam. Together with the French consultant EDF (Électricité de France), DEWA developed a concept to create a new upper reservoir at a distance of 1.3 km and 150 m higher than the existing lower reservoir. The plan involved constructing two small dams with heights of 65 m and 30 m close to an old meander in the Hajar Mountains. A 1,300 m-long tunnel with some 7 m in diameter will connect the two reservoirs. With a capacity of approximately 200 m3/s and partially lined with steel, the tunnel is a key feature of the new Hatta Pumped Storage Power Plant.
© creativefamiliy - stock.adobe.com
The SolutionFor this challenging and unique project on the Arabian Peninsula, ANDRITZ Hydro formed a consortium with the civil works partners STRABAG and ÖZKAR. With support from the French consultant Artelia, the consortium was able to further improve the initial concept for the power plant and present a technically and commercially optimized offer to DEWA. This put the ANDRITZ Hydro-STRABAG-ÖZKAR consortium in a prime position once the tender opened. Following a series of rounds of technical and commercial clarification – during which all the specific details and benefits of the offer as presented were discussed with DEWA and the employer’s engineer – the consortium was awarded the contract to realize this prestigious project onThe final concept is based on a shaft-type powerhouse close to the existing reservoir. It will host two pump turbine and motor-generator units with a capacity of 125 MW each. Capable of producing a total net power of 250 MW over a six-hour generation cycle in turbine mode and a 7.4-hour storage cycle in pumping mode, the project provides an overall storage capacity of some 1,500 MWh.
Due to the relatively limited reservoir capacities, the available head will vary significantly, changing between 175 and 125 m during the charge-discharge cycle. To overcome this large head variation while keeping the units running at a high efficiency over the complete cycle, both pump turbine units are equipped with double-fed asynchronous motor-generators. They allow the units to operate at variable speed. ANDRITZ Hydro is one of the few global suppliers to have reference projects and appropriate expertise in the design, manufacture and installation of such specific and challenging technology.
This unique undertaking to generate electrical energy using pumped storage power technology in the desert has a signal effect for the future of clean energy in the generation mix. It’s a flagship project not only in the Arabian Peninsula, but for every hot and dry region of the world.”
The Scope of SupplySTRABAG is acting as the consortium leader and joined forces with the Turkish ÖZKAR Group to execute the civil engineering elements of the project. STRABAG is a global leader in the execution of large infrastructure projects while ÖZKAR fields outstanding references in Rolled Compacted Concrete (RCC) Dams, the technology chosen for the Hatta Project. ANDRITZ Hydro will be the consortium partner responsible for the entire electro- and hydro-mechanical equipment for the Hatta Pumped Storage Power Plant. ANDRITZ Hydro’s scope of works to be engineered, supplied, installed and commissioned consists of two Francis-type pump turbines with double-fed generators and auxiliary systems including excitation, automation, as well as the control and protection systems. Furthermore, ANDRITZ Hydro will also supply the main power transformers, GIS switchyard and some 9 km of high voltage cables to connect the new power plant to the national grid. In relation to the waterways, ANDRITZ Hydro will engineer, supply and install all gates and trash racks along with approximately 320 m of penstock steel lining. The company will also supply the main inlet valves at both the high and low pressure sides of the turbines.
Before initiating manufacture of the units, ANDRITZ Hydro will confirm the guaranteed characteristics of the turbine through a detailed model test. Testing is to be conducted in one of ANDRITZ Hydro’s own laboratories.
Lighthouse projectConsidered a lighthouse project for our customer DEWA as well as other utilities and electricity producers across the whole region,this contract is a very important milestone for ANDRITZ Hydro and its consortium partners. Upon successful completion of Hatta it is very likely that additional projects of a similar nature will be developed in the region to further improve the share of clean energy in the generation mix.
|
|
|
|
|
|
|
|
Lagi besar dari empangan purba empangan maarib ke?
|
|
|
|
|
|
|
|
Alhamdulillah semenjak mengiktiraf israel dengan abraham accord Uae semakin maju dan makmur
Xrugi berbaik dgn israel |
|
|
|
|
|
|
|
Ye inilah masanya utk cepatkan lg kiamat. Tinggal Malaysia dgn Indonesia ja dok jual mahal. Pak Arab semua dah on dah tu. Kt bila lg? hahaHAHA
|
|
|
|
|
|
|
|
Gurun Sahara akan menjadi hutan rimba.
|
|
|
|
|
|
|
|
mana leh lawan bakun hydro |
|
|
|
|
|
|
|
Empangan ini lambat pun tak apa, Yang penting seperti kasino tu buat dulu lah |
|
|
|
|
|
|
|
sharlenetexas replied at 28-1-2023 03:24 PM
Gurun Sahara akan menjadi hutan rimba.
Adakah akan ada sekuntum bunga di gurun sahara? |
|
|
|
|
|
|
|
gigahertz replied at 29-1-2023 11:44 PM
Adakah akan ada sekuntum bunga di gurun sahara?
Rasanya teratai layu di tasik madu |
|
|
|
|
|
|
|
hahaha..akhir zaman al-kesah dongang ja kau mati kaulah 1 org kiamat
|
|
|
|
|
|
|
|
READxDREAM replied at 28-1-2023 11:22 PM
Ye inilah masanya utk cepatkan lg kiamat. Tinggal Malaysia dgn Indonesia ja dok jual mahal. Pak Ar ...
Sibuk ngan kiamat. Ko mati dulu lah,kiamat utk ko |
|
|
|
|
|
|
|
Sehingga sekarang dubai tiada sewage system... Burj khalifa perlu truck bawa najis |
|
|
|
|
|
|
|
Dwdrum replied at 30-1-2023 09:11 AM
Sehingga sekarang dubai tiada sewage system... Burj khalifa perlu truck bawa najis
Hahaahha.. cemane dapat CCC or CF utk operate.. hahahahha |
|
|
|
|
|
|
|
green~tea replied at 29-1-2023 05:15 PM
Hahaahha.. cemane dapat CCC or CF utk operate.. hahahahha
Setiap kali hujan depa banjir kan.. Longkang pun tiada |
|
|
|
|
|
|
|
Dwdrum replied at 30-1-2023 09:16 AM
Setiap kali hujan depa banjir kan.. Longkang pun tiada
Tak perasan time hujan tu.. i tengok fountain lake dia je lawo.. tp byk gila je tasik buatan keliling dubai tu.. maybe design philosophy depa tak include big amount rain water.. storm water drain & pond pun takde penampakan |
|
|
|
|
|
|
|
cam lirik lagu,
engkau la, sekuntun bunga sakura....
oh sa...kuuu..rraaa...
|
|
|
|
|
|
|
|
betul ke?
ish...dah macam zaman pi mai2 tangtu, ada orang angkat najis...
tp skrg mgkn systematic la,
apa la akan jadi kalo tak angkut 1 hari? atau tempat simpanan najis penuh?
perhatian...
tempat simpanan najs kami penuh, di harap pengunjung tidak membuang najis buat masa ini, sekian terima kasih...
|
|
|
|
|
|
|
|
malayisa ada ke system sewage
bukan ke IWK bawak lori sedut taik
|
|
|
|
|
|
|
|
green~tea replied at 29-1-2023 05:28 PM
Tak perasan time hujan tu.. i tengok fountain lake dia je lawo.. tp byk gila je tasik buatan kelil ...
Depa memang cari clean water.. Issue negara ereb.. Dahulu kata nya mahu ambil iceberg dari north pole....
https://www.mei.edu/publications/water-issues-gulf-time-action |
|
|
|
|
|
|
| |
|