CariDotMy

 Forgot password?
 Register

ADVERTISEMENT

View: 4917|Reply: 3

JOB OPENING FROM ALSTOM (MALAYSIA)

[Copy link]
Post time 13-10-2011 02:30 PM | Show all posts |Read mode
Min 6 months exp
For details, PM me


ALSTOM Power Asia Pacific Sdn Bhd

Job Title: Project Engineer, Engineering Department
Reports directly to: Line Manager “Mechanical Equipment & Systems”
Reports functionally to: Assigned Lead Engineer (LE)
Direct subordinates: ACAD Draftsperson, Designers

JOB DESCRIPTION

General:
  • To comply to the Company’s EHS Policies, Rules and Procedures



Specific to the Engineering Function:
In general, the Project Engineer complies with the Plant Business Management System MEGA, the Plant Business Manuals (PBM) and the Project Engineering File (PEF), and applies the imposed tools.  He/she ensures on time delivery of the project engineering activities to contractual requirements.  The following are the general project engineering task & responsibilities:
  • Report to the Lead Engineer the status of the assigned tasks
  • Provide input for the preparation of system time schedule and flat file upon request by LE
  • In case of supplier and/or customer meetings, prepare or ensure the preparation of meeting reports
  • Provide information to prepare the engineering progress upon request by LE
  • Ensure completeness and full compliance of the deliverables with the contractual specifications
  • Ensure that documents are prepared according to the engineering time schedule (flat file)
  • Analyse client comments and elaborate comprehensive answers
  • Participate in design and/or technical reviews (internal/external)
  • Represent the assigned scope at meetings with the customer if required
  • Validate documents with the appropriate engineering status and distribute according to the project specific distribution key
  • Support the erection and commissioning activities
  • Prepare reply of Non Conformance Reports (NCR) and take the necessary actions
  • Prepare FSI in case of changes during construction if necessary
  • Close out punch list items to obtain PAC and FAC as required by the LE
  • Prepare as-built documentation as required by the LE
  • Support claim management
  • Ensure the feed-back of experience from the project via the Lead Engineer or directly in the Experience Response System (ERS)



Particularly, the Project Engineer for Process Engineering has the following technical and time schedule responsibility for the engineering work and/or services assigned to him/her by the LE:
  • Prepare piping and instrumentation diagrams and ensure follow-up
  • Provide input for the preparation of the equipment calculation notes
  • Deliver on time the project process engineering documentation (mainly P&ID’s, system descriptions, signal exchange lists, analogue and logic diagrams (PFUPs), mechanical interfaces lists, electrical consumers list, piping list, valve list, operating instructions)
  • Provide the design data for electrical, valve and piping engineering
  • Provide requirements for the preparation of the instrumentation package
  • Ensure that the arrangement and the piping routing correspond to the process requirements
  • Manage the interfaces with internal participants and external partners, and take action if necessary
  • Prepare cost to complete if required by the LE (engineering hours)
  • Ensure the studies of the instrumentation erection design
  • Provide and follow-up the instrumentation equipment specification
  • Analyse and prepare comments on electrical and control parts of equipment documentation
  • Provide the O&M documentation for his/her scope of supply and services




Particularly, the Project Engineer for Product Engineering has the following technical and time schedule responsibility for the engineering work and/or services assigned to him/her by the LE:
  • Participate in the elaboration of the procurement concept (Engineering/Procurement Plan EPP) as required by the LE or the Project Engineering Manager (PEM), and implement the EPP
  • Take the basic input data from the LE in order to prepare the technical dossier
  • Prepare the Technical Dossier for Procurement to issue for quotation ensuring that it complies with the contract client technical document requirements and contract time schedule for delivery of equipment and documents
  • Support the preparation of the Quality Control Plan (QCP)
  • Prepare the Request for Quotation (RfQ) and Purchase requisition with the appropriate template
  • Negotiate and agree with the suppliers the technical solution of the equipment
  • Prepare the technical tender analysis (supplier evaluation) including comparison with basis used for tender PCDB
  • Prepare and sign the final equipment technical dossier
  • Provide support to Procurement to define the technical input to the liquidated damages and guarantee document
  • Technically manage the equipment subcontract
  • Support Procurement in the management of all claims and variations from the subcontractor
  • Manage interfaces between the equipment subcontractor and all internal participants and external partners, and take action if necessary
  • Ensure completeness and full compliance of the deliverables with the contractual specifications. In case of unavoidable deviation between ALSTOM and supplier requirements, ask for approval by the LE
  • Ensure on time equipment follow-up (EFU-process) for the preparation of the packing list
  • Prepare cost to complete if required by the LE (engineering hours and hardware cost)
  • Participate in acceptance test at the supplier’s as required and prepare the corresponding acceptance checklist

In addition, the Project Engineer has the following tasks and responsibilities within the Line Organization:
  • Provide assistance in establishing documentation of know-how in his/her respective area
  • Consolidation of feedback from executed projects and development of technical solutions in cooperation with Lead Centres
  • Support technical tendering activities


Performance Measurement:
  • Objectives, Targets and Performance Measurements are defined on a yearly basis.



Authority:
  • Obtain on-time decisions from LE
  • Receive on-time comprehensive and binding information relevant for the task to be performed from those functions involved in the project
  • Receive technical support from LE and Product Expert
  • Access to technical tools and corresponding support as well as specialists’ know-how


Qualification, Competencies & Experience:

Education:
  • University Degree in Engineering
  • Experience in power plant engineering or related industries


Specific knowledge and skills:
  • Good command of written and spoken English
  • Able to work in a teamwork environment with minimum supervision
  • Knowledge of power plant systems or products
  • Knowledge of engineering processes and tools


--------------------------------------------------------------------------------------------------------------------------------------------------

Job Title         : Inspection Coordinator

Role:
  • Coordination with Purchasing, Project      Teams, Supplier Quality Managers, Suppliers
  • Performing all the internal and      external communication related to the task.
  • Implementation of Pre-Shipment      Inspections.
  • Evaluation of offers in collaboration      with the Q-Coordinator and preparation of orders.
  • Enquiring inspection services based on      technical input received from Supplier Quality Managers.
  • Ensures right reporting at the right      time for the assigned respective Project(s)
  • Ensures Specific requests on      interventions are handled in prompt and efficient manner to the      satisfaction of Project
  • Proactively manage intervention for      the Supply Quality Managers such that resources are managed efficiently      and cost optimized.
  • Ensures regular updating of the data      related to his / her scope in the respective IT Tools
  • Coordinates the Supplier Performance      Rating process from its initiation till hand over to the respective
  • Preparing and issuing of purchase      orders inspection companies.
  • Preparations of inspection requests      and follow up on purchase orders.
  • Performance of Commercial follow up of      purchase orders including check of received invoices, payment release and filing      of all related documents.
  • Performing analysis of statistical      data and preparation of statistical reports.
  • Introduction and maintenance of the      Supplier Monitoring Codes and Standards Library.
  • Managing of completeness of component      lists and loading in EPC SYSTEM.
  • IT tool Owner (e.g. SUMO or Power      Source Database)


Accountabilities:
  • Supports the Supply Quality Manager(s)      and is responsible for:
  • The overall organization of the      inspection assignments in prompt and efficient manner.
  • Continuous improvement of the      inspection process.
  • Database and document Management
  • Reporting
  • Supplier Performance Rating
  • SUMO Database Application
  • Administration of the LOGINS tool.


Performance Indicators:
  • Is measured on the adherence to      intervention planning for TPIC’s.
  • Feedback received from Supplier      Quality Managers and Project Procurement and Logistics Managers
  • Correct implementation and Logins.
  • Timely completion and accuracy of      reporting
  • Further Objectives, Targets and      Performance Measurements are defined on a yearly basis.


Authority:
  • Authority and competency to use all      means and tools, which are necessary to perform tasks, outlined in item:      Accountabilities.
  • Has authority to assign inspectors in      cooperation with the Supply Quality Manager depending on the specific      requirements
Reply

Use magic Report


ADVERTISEMENT


 Author| Post time 13-10-2011 02:31 PM | Show all posts
Job Title: Project Engineer, Engineering Department

Reports directly to:  Line Manager “Mechanical Equipment & Systems”
Reports functionally to:  
  • Group Leader “Water / Steam Cycle”
  • Assigned Lead Engineer (LE)


Direct subordinates:
  • ACAD Draftsperson
  • Designers


Tasks & Responsibilities:

General:
To comply to the Company’s EHS Policies, Rules and Procedures

Specific to the Engineering Function:
In general, the Project Engineer complies with the Plant Business Management System MEGA, the Plant Business Manuals (PBM) and the Project Engineering File (PEF), and applies the imposed tools.  He/she ensures on time delivery of the project engineering activities to contractual requirements.  The following are the general project engineering task & responsibilities:
  • Report to the Lead Engineer the status of the assigned tasks
  • Provide input for the preparation of system time schedule and flat file upon request by LE
  • In case of supplier and/or customer meetings, prepare or ensure the preparation of meeting reports
  • Provide information to prepare the engineering progress upon request by LE
  • Ensure completeness and full compliance of the deliverables with the contractual specifications
  • Ensure that documents are prepared according to the engineering time schedule (flat file)
  • Analyse client comments and elaborate comprehensive answers
  • Participate in design and/or technical reviews (internal/external)
  • Represent the assigned scope at meetings with the customer if required
  • Validate documents with the appropriate engineering status and distribute according to the project specific distribution key
  • Support the erection and commissioning activities
  • Prepare reply of Non Conformance Reports (NCR) and take the necessary actions
  • Prepare FSI in case of changes during construction if necessary
  • Close out punch list items to obtain PAC and FAC as required by the LE
  • Prepare as-built documentation as required by the LE
  • Support claim management
  • Ensure the feed-back of experience from the project via the Lead Engineer or directly in the Experience Response System (ERS)





Particularly, the Project Engineer for Process Engineering has the following technical and time schedule responsibility for the engineering work and/or services assigned to him/her by the LE:
  • Prepare piping and instrumentation diagrams and ensure follow-up
  • Provide input for the preparation of the equipment calculation notes
  • Deliver on time the project process engineering documentation (mainly P&ID’s, system descriptions, signal exchange lists, analogue and logic diagrams (PFUPs), mechanical interfaces lists, electrical consumers list, piping list, valve list, operating instructions)
  • Provide the design data for electrical, valve and piping engineering
  • Provide requirements for the preparation of the instrumentation package
  • Ensure that the arrangement and the piping routing correspond to the process requirements
  • Manage the interfaces with internal participants and external partners, and take action if necessary
  • Prepare cost to complete if required by the LE (engineering hours)
  • Ensure the studies of the instrumentation erection design
  • Provide and follow-up the instrumentation equipment specification
  • Analyse and prepare comments on electrical and control parts of equipment documentation
  • Provide the O&M documentation for his/her scope of supply and services



Particularly, the Project Engineer for Product Engineering has the following technical and time schedule responsibility for the engineering work and/or services assigned to him/her by the LE:
  • Participate in the elaboration of the procurement concept (Engineering/Procurement Plan EPP) as required by the LE or the Project Engineering Manager (PEM), and implement the EPP
  • Take the basic input data from the LE in order to prepare the technical dossier
  • Prepare the Technical Dossier for Procurement to issue for quotation ensuring that it complies with the contract client technical document requirements and contract time schedule for delivery of equipment and documents
  • Support the preparation of the Quality Control Plan (QCP)
  • Prepare the Request for Quotation (RfQ) and Purchase requisition with the appropriate template
  • Negotiate and agree with the suppliers the technical solution of the equipment
  • Prepare the technical tender analysis (supplier evaluation) including comparison with basis used for tender PCDB
  • Prepare and sign the final equipment technical dossier
  • Provide support to Procurement to define the technical input to the liquidated damages and guarantee document
  • Technically manage the equipment subcontract
  • Support Procurement in the management of all claims and variations from the subcontractor
  • Manage interfaces between the equipment subcontractor and all internal participants and external partners, and take action if necessary
  • Ensure completeness and full compliance of the deliverables with the contractual specifications. In case of unavoidable deviation between ALSTOM and supplier requirements, ask for approval by the LE
  • Ensure on time equipment follow-up (EFU-process) for the preparation of the packing list
  • Prepare cost to complete if required by the LE (engineering hours and hardware cost)
  • Participate in acceptance test at the supplier’s as required and prepare the corresponding acceptance checklist


In addition, the Project Engineer has the following tasks and responsibilities within the Line Organization:
  • Provide assistance in establishing documentation of know-how in his/her respective area
  • Consolidation of feedback from executed projects and development of technical solutions in cooperation with Lead Centres
  • Support technical tendering activities



Performance Measurement:
  • Objectives, Targets and Performance Measurements are defined on a yearly basis.



Authority:
  • Obtain on-time decisions from LE
  • Receive on-time comprehensive and binding information relevant for the task to be performed from those functions involved in the project
  • Receive technical support from LE and Product Expert
  • Access to technical tools and corresponding support as well as specialists’ know-how



Qualification, Competencies & Experience:

Education:
  • University Degree in Engineering
  • Experience in power plant engineering or related industries


Specific knowledge and skills:
  • Good command of written and spoken English
  • Able to work in a teamwork environment with minimum supervision
  • Knowledge of power plant systems or products
  • Knowledge of engineering processes and tools


--------------------------------------------------------------------------------------------------------------------------------------------------

Cabling Engineer (Brief detail) (1 position) – 1yr Contract
Technician Level to Engineer Level



Cabling Activities for Electrical & I&C
  • involves      Loadlist, Cable sizing, Cable Management, Cable routing, Termination Chart
  • Skills      - ACAD and PDMS (would be advantage)
  • ALSTOM      tools will be utilised
  • Site      traveling is expected


Reply

Use magic Report

 Author| Post time 13-10-2011 02:32 PM | Show all posts
Job Title: Project Engineer, Engineering Department

Reports directly to:  Line Manager “Mechanical Equipment & Systems”
Reports functionally to:  
  • Group Leader “Water / Steam Cycle”
  • Assigned Lead Engineer (LE)


Direct subordinates:
  • ACAD Draftsperson
  • Designers


Tasks & Responsibilities:

General:
To comply to the Company’s EHS Policies, Rules and Procedures

Specific to the Engineering Function:
In general, the Project Engineer complies with the Plant Business Management System MEGA, the Plant Business Manuals (PBM) and the Project Engineering File (PEF), and applies the imposed tools.  He/she ensures on time delivery of the project engineering activities to contractual requirements.  The following are the general project engineering task & responsibilities:
  • Report to the Lead Engineer the status of the assigned tasks
  • Provide input for the preparation of system time schedule and flat file upon request by LE
  • In case of supplier and/or customer meetings, prepare or ensure the preparation of meeting reports
  • Provide information to prepare the engineering progress upon request by LE
  • Ensure completeness and full compliance of the deliverables with the contractual specifications
  • Ensure that documents are prepared according to the engineering time schedule (flat file)
  • Analyse client comments and elaborate comprehensive answers
  • Participate in design and/or technical reviews (internal/external)
  • Represent the assigned scope at meetings with the customer if required
  • Validate documents with the appropriate engineering status and distribute according to the project specific distribution key
  • Support the erection and commissioning activities
  • Prepare reply of Non Conformance Reports (NCR) and take the necessary actions
  • Prepare FSI in case of changes during construction if necessary
  • Close out punch list items to obtain PAC and FAC as required by the LE
  • Prepare as-built documentation as required by the LE
  • Support claim management
  • Ensure the feed-back of experience from the project via the Lead Engineer or directly in the Experience Response System (ERS)





Particularly, the Project Engineer for Process Engineering has the following technical and time schedule responsibility for the engineering work and/or services assigned to him/her by the LE:
  • Prepare piping and instrumentation diagrams and ensure follow-up
  • Provide input for the preparation of the equipment calculation notes
  • Deliver on time the project process engineering documentation (mainly P&ID’s, system descriptions, signal exchange lists, analogue and logic diagrams (PFUPs), mechanical interfaces lists, electrical consumers list, piping list, valve list, operating instructions)
  • Provide the design data for electrical, valve and piping engineering
  • Provide requirements for the preparation of the instrumentation package
  • Ensure that the arrangement and the piping routing correspond to the process requirements
  • Manage the interfaces with internal participants and external partners, and take action if necessary
  • Prepare cost to complete if required by the LE (engineering hours)
  • Ensure the studies of the instrumentation erection design
  • Provide and follow-up the instrumentation equipment specification
  • Analyse and prepare comments on electrical and control parts of equipment documentation
  • Provide the O&M documentation for his/her scope of supply and services



Particularly, the Project Engineer for Product Engineering has the following technical and time schedule responsibility for the engineering work and/or services assigned to him/her by the LE:
  • Participate in the elaboration of the procurement concept (Engineering/Procurement Plan EPP) as required by the LE or the Project Engineering Manager (PEM), and implement the EPP
  • Take the basic input data from the LE in order to prepare the technical dossier
  • Prepare the Technical Dossier for Procurement to issue for quotation ensuring that it complies with the contract client technical document requirements and contract time schedule for delivery of equipment and documents
  • Support the preparation of the Quality Control Plan (QCP)
  • Prepare the Request for Quotation (RfQ) and Purchase requisition with the appropriate template
  • Negotiate and agree with the suppliers the technical solution of the equipment
  • Prepare the technical tender analysis (supplier evaluation) including comparison with basis used for tender PCDB
  • Prepare and sign the final equipment technical dossier
  • Provide support to Procurement to define the technical input to the liquidated damages and guarantee document
  • Technically manage the equipment subcontract
  • Support Procurement in the management of all claims and variations from the subcontractor
  • Manage interfaces between the equipment subcontractor and all internal participants and external partners, and take action if necessary
  • Ensure completeness and full compliance of the deliverables with the contractual specifications. In case of unavoidable deviation between ALSTOM and supplier requirements, ask for approval by the LE
  • Ensure on time equipment follow-up (EFU-process) for the preparation of the packing list
  • Prepare cost to complete if required by the LE (engineering hours and hardware cost)
  • Participate in acceptance test at the supplier’s as required and prepare the corresponding acceptance checklist


In addition, the Project Engineer has the following tasks and responsibilities within the Line Organization:
  • Provide assistance in establishing documentation of know-how in his/her respective area
  • Consolidation of feedback from executed projects and development of technical solutions in cooperation with Lead Centres
  • Support technical tendering activities



Performance Measurement:
  • Objectives, Targets and Performance Measurements are defined on a yearly basis.



Authority:
  • Obtain on-time decisions from LE
  • Receive on-time comprehensive and binding information relevant for the task to be performed from those functions involved in the project
  • Receive technical support from LE and Product Expert
  • Access to technical tools and corresponding support as well as specialists’ know-how



Qualification, Competencies & Experience:

Education:
  • University Degree in Engineering
  • Experience in power plant engineering or related industries


Specific knowledge and skills:
  • Good command of written and spoken English
  • Able to work in a teamwork environment with minimum supervision
  • Knowledge of power plant systems or products
  • Knowledge of engineering processes and tools

Rate

1

View Rating Log

Reply

Use magic Report

Post time 4-5-2012 04:05 PM | Show all posts
available lg x?
Reply

Use magic Report

You have to log in before you can reply Login | Register

Points Rules

 

ADVERTISEMENT



 

ADVERTISEMENT


 


ADVERTISEMENT
Follow Us

ADVERTISEMENT


Mobile|Archiver|Mobile*default|About Us|CariDotMy

15-11-2024 01:23 AM GMT+8 , Processed in 0.045395 second(s), 14 queries , Gzip On, Redis On.

Powered by Discuz! X3.4

Copyright © 2001-2021, Tencent Cloud.

Quick Reply To Top Return to the list