CariDotMy

 Forgot password?
 Register


ADVERTISEMENT

CariDotMy Portal Politic Lihat artikel

PLUS Explains Toll Exemption For Second Penang Bridge

4-3-2014 07:45 PM| Diterbitkan: admin9| Dilihat: 1900| Komen: 0

PENANG_SECOND_BRIDGE_010314_TMIHASNOOR_02_540_358_100.jpg

The one-month toll exemption announced by Prime Minister Datuk Seri Najib Tun Razak is only for vehicles using the Sultan Abdul Halim Mu’adzam Shah Bridge (Second Penang Bridge) Toll Plaza operated by Jambatan Kedua Sdn Bhd (JKSB), Plus Malaysia Berhad (Plus) said today.

"Motorists heading for Batu Kawan (on the mainland) or the Second Penang Bridge via the Bandar Cassia Toll Plaza from the North-South Expressway have to pay toll," it said. The Bandar Cassia Toll Plaza opened on March 2.

Motorists from the Second Penang Bridge or Batu Kawan entering the North-South Expressway would have to obtain a transit ticket or use the Touch 'n Go card or SmartTAG at the entry lane at the Bandar Cassia Toll Plaza, it said.

The statement said the elevated interchange and the Bandar Cassia Toll Plaza at Km154 linking the North-South Expressway to the Second Penang Bridge was operated by PLUS, and the toll was collected as usual and was subject to the rates set.

Najib opened the Second Penang Bridge on March 1 and announced that motorists using the bridge would not be charged toll for a month. – Bernama, March 4, 2014.



Bagus

Marah

Terkejut

Sedih

Lawak

Bosan

ADVERTISEMENT


Anda Mungkin Meminati


ADVERTISEMENT



ADVERTISEMENT


 


 


ADVERTISEMENT



ADVERTISEMENT


Mobile|Archiver|Mobile*default|About Us|CariDotMy

27-11-2024 01:40 AM GMT+8 , Processed in 0.028159 second(s), 13 queries , Gzip On, Redis On.

Powered by Discuz! X3.4

Copyright © 2001-2021, Tencent Cloud.

To Top