[Politik] 228 Juta Euro beli train yang tak muat lalu trowong

[Copy link]
Post time 11-2-2023 06:31 PM | Show all posts |Read mode
Edited by matamata at 12-2-2023 02:42 PM

Spain spends £230MILLION on new trains... only to find they're too big to fit through tunnels



The blunder has led to two travel bosses being sacked
Carl Bennett SENIOR DIGITAL PRODUCER


PUBLISHED Wednesday 08 February 2023 - 14:48










An “outrageous botch-up” has caused dozens of new trains to be too big to travel through tunnels in Spain.
The blunder has led to two travel bosses being sacked.
The national rail operator, Renfe, and track company,
Adif, have had a war of words over the costly mistake, which has caused new services to be delayed until 2026 – two years later than expected The left-wing coalition government have also been attacked for failing to notice the error ahead of time.
The country’s transport minister, Raquel Sanchez, said those who were responsible for the mistake would be dismissed.
Renfe confirmed its rolling stock manager had been fired, with Adig announced their technology inspectorate head had also been dismissed.
The 31 new trains, costing €258 million (£230 million) will now have to be redesigned in order to travel safely on their routes, which will serve the northern Spanish regions of Asturias and Cantabria.
Ms Sanchez has said the trains are still in a design phase, therefore minimising the cost of the error, but the president of Cantabria, Miguel Angel Revilla, described the mistake as an “outrageous botch-up.”
“When a project is launched, one assumes the company in charge knows what it has to provide.”
Revilla added: “If it is a train, it has to know the width of the wheels and if the train has to go through a tunnel.”
The Spanish Transport Ministry say the design phase will be completed this summer.
An internal investigation has been opened.
Sources from Renfe say the blame is solely because of Adif, telling Asturian local newspaper La Nueva Espana: “We don’t go and measure the tunnels; we simply take measurements from the company that owns the infrastructure and include them in the specifications of the contract.
“The problem is that the ‘official’ measurements of the tunnels do not correspond to reality.”
Adif hit back, saying it is not responsible for the contract specifications by Renfe.


https://www.gbnews.uk/news/spain-spends-230million-on-new-trains-only-to-find-theyre-too-big-to-fit-through-tunnels/438811


Komen----->












Reply

Use magic Report


ADVERTISEMENT


Post time 11-2-2023 07:01 PM | Show all posts



Reply

Use magic Report

Post time 11-2-2023 07:59 PM | Show all posts
Sebab tu sebelum projek kena buat site survey dulu. Ukur sendiri di site dan jangan percaya apa yg tulis atas kertas.
Reply

Use magic Report

Post time 11-2-2023 08:26 PM | Show all posts
Dulu ada keah bangunan seratus tingkat siap tapi tiada lif

so guna tangga jelah.

tapi Msia lagi hebat dah bayar berbilion2

kapal tiada heli pun takde.

yg soglap dok masih rakyat sokong jadi YB
Reply

Use magic Report

Post time 11-2-2023 08:33 PM | Show all posts
jualah kat org politik msia satu billion euro pasti laku,
Reply

Use magic Report

Post time 11-2-2023 11:31 PM From the mobile phone | Show all posts
Barang order vs Barang Sampai.
Reply

Use magic Report

Follow Us
Post time 11-2-2023 11:47 PM From the mobile phone | Show all posts
Ntah² saiz terowong telah dikecilkan sewaktu pembinaan.
Geng procurement gerabak pula kekal ikut saiz terowong asal.
Reply

Use magic Report

Post time 12-2-2023 12:09 AM From the mobile phone | Show all posts
Bila orang puteh jadi bodoh bebal....sekor forummerpun tak de yg kutuk.
Tapi bila Indon buat hal........ berjemaah mengutuk kaw2
Reply

Use magic Report


ADVERTISEMENT


Post time 12-2-2023 07:03 AM From the mobile phone | Show all posts
Lawak juga kan
Rasa macam tak masuk akal
Reply

Use magic Report

Post time 12-2-2023 08:24 AM From the mobile phone | Show all posts
i penah kena… kontraktor percaya je measurement yg kilang bagi.. tapi benda tak mahal sgt. cuma buang masa/tenaga la hantar barang, reject balik& buat balik… yg ni… siapa la yg nak absorb kos rugi.. tkde siapa meniaga nak rugi
Reply

Use magic Report

Post time 12-2-2023 08:32 AM | Show all posts
Tahun 2013 ada berlaku high speed train crash di Spain pun company Renfe ni juga
Agaknya Renfe ni macam KTMB dekat Malaysia lah kot
Punca pasal pilot nya ralit menjawab phone call sampai terlepas landmark utk slow down sebelum sampai selekoh tajam
Boleh try search Santiago de Compostela derailment
Kelakar juga la Spain ni tahun 2013 pun masih pakai sistem manual harapkan pilot utk alert landmark tu
Reply

Use magic Report

Post time 12-2-2023 08:32 AM From the mobile phone | Show all posts
TOPwind replied at 11-2-2023 08:26 PM
Dulu ada keah bangunan seratus tingkat siap tapi tiada lif

so guna tangga jelah.

Beli kapal selam tapi tak boleh selam. Tue pun yer jgk. Haha
Reply

Use magic Report

Post time 12-2-2023 08:45 AM From the mobile phone | Show all posts
So kena tambah kos utk besarkan terowong la kan?? Or jual train ke negara lain lah…rasanya impossible utk kecik kan train tu sbb serupa mcm buat balik keseluruhan

Apa2 pon dlm project kan ada terms n condition…x kan xde paper work before implement? Gomen boleh saman engineer n consultant project
Reply

Use magic Report

Post time 12-2-2023 08:46 AM From the mobile phone | Show all posts
AverageJoe replied at 12-2-2023 08:32 AM
Tahun 2013 ada berlaku high speed train crash di Spain pun company Renfe ni juga
Agaknya Renfe ni ma ...

Spain juga…train depa mmg problematic ke?? Takut juga nak naik train depa kalau mcm ni kan
Reply

Use magic Report

Post time 12-2-2023 08:52 AM From the mobile phone | Show all posts
SalenaGomez replied at 12-2-2023 08:45 AM
So kena tambah kos utk besarkan terowong la kan?? Or jual train ke negara lain lah…rasanya impossib ...

Train masih dlm design phase. Tukar design dlm komputer je bagi kecik muat ikut saiz terowong..
Reply

Use magic Report

Post time 12-2-2023 08:54 AM From the mobile phone | Show all posts
Pound dalam english bila translate bm jadi euro
Reply

Use magic Report


ADVERTISEMENT


Post time 12-2-2023 08:55 AM From the mobile phone | Show all posts
grouper replied at 12-2-2023 08:52 AM
Train masih dlm design phase. Tukar design dlm komputer je bagi kecik muat ikut saiz terowong..

Oohooooo my mistake salah baca…tp costly juga ya nak redesign
Reply

Use magic Report

 Author| Post time 12-2-2023 08:59 AM | Show all posts
Decaffeinated replied at 12-2-2023 08:54 AM
Pound dalam english bila translate bm jadi euro


Reply

Use magic Report

Post time 12-2-2023 09:09 AM From the mobile phone | Show all posts
SalenaGomez replied at 12-2-2023 08:45 AM
So kena tambah kos utk besarkan terowong la kan?? Or jual train ke negara lain lah…rasanya impossib ...

Ms Sanchez has said the trains are still in a design phase, therefore minimising the cost of the error,

Besar kan terowong lagi lah costly dgn down time lagi. Aku saspek yg tak muat ni fitting and accessories eg. tanduk tangan etc. masih boleh adjust.
Reply

Use magic Report

Post time 12-2-2023 02:14 PM From the mobile phone | Show all posts
Dia order kt shopee 10.10 ke
Reply

Use magic Report

12Next
Return to list New
You have to log in before you can reply Login | Register

Points Rules

 

ADVERTISEMENT



 

ADVERTISEMENT


 


ADVERTISEMENT
Follow Us

ADVERTISEMENT


Mobile|Archiver|Mobile*default|About Us|CARI Infonet

30-4-2024 12:58 AM GMT+8 , Processed in 0.092429 second(s), 51 queries .

Powered by Discuz! X3.4

Copyright © 2001-2021, Tencent Cloud.

Quick Reply To Top Return to the list