CARI Infonet

 Forgot password?
 Register

ADVERTISEMENT

Author: rosemary70

Kenderaan Perang....

[Copy link]
Post time 20-12-2010 10:26 AM | Show all posts
POLAND

7TP


TK Tankette


Vicker Mk E-twin


Vicker Mk E-single


Wz.34


Wz.29





to be continue............
Reply

Use magic Report


ADVERTISEMENT


Post time 20-12-2010 10:56 AM | Show all posts
Post Last Edit by ctaz at 23-12-2010 09:47

Czechoslovakia

LT vz. 34


LT vz. 35


LT vz. 38


Tančík vz. 33


AH-IV


OA vz. 30


Hungary

40M Turán I


75M Turán II


38M Toldi I


41M Toldi II


39M Csaba
Reply

Use magic Report

Post time 20-12-2010 12:19 PM | Show all posts
Post Last Edit by ctaz at 23-12-2010 09:52

Italy

Fiat 3000


L3/33


L3/35


Fiat M11/39


Lancia IZM


Autoblinda 40


British

Vicker Mk II


Vicker Mk VI


Cruiser Mk I


Matilda I
http://upload.wikimedia.org/wikipedia/commons/thumb/c/c9/IWM-KID-68-Matilda.jpg/300px-IWM-KID-68-Matilda.jpg

Matilda II


Universal Carrier


Daimler Dingo


Vickers A1E1 Independent
Reply

Use magic Report

Post time 20-12-2010 12:50 PM | Show all posts
Japan

Type 94 Te-Ke


Type 97 Te-Ke


Type 92 Jyu-Sokosha


Type 95 Ha-Go


Type 98 Ke-Ni


USA

M2 Light Tank


M1 Combat Car


M2 Medium Tank


Germany

Panzer I


Panzer II


Panzer III Ausf A ~ Ausf F


Panzer IV Ausf A ~ Ausf D


SdKfz. 221


SdKfz. 222


Sd.Kfz. 231


Sd.Kfz. 232


Neubaufahrzeug
Reply

Use magic Report

Post time 20-12-2010 03:44 PM | Show all posts
Post Last Edit by ctaz at 20-12-2010 16:38

USSR

T-18


T-26


T-37


T-38


T-28


SMK


T-35


T-100


BT tank (BT-3 ~ BT-7M)
Reply

Use magic Report

Post time 22-12-2010 10:03 AM | Show all posts
middle world war II tank 1941 ~ 1943

Germany

Panzer III Ausf G ~ Ausf N


Panzer IV Ausf E ~ Ausf J


Panzer V Panther


Panzer VI Tiger I


Wespe


Hummel


Karl-Gerät 040


Stug III Ausf A ~ Ausf G


Stug IV


StuH 42


Panzer I B mit I.G. 33


Sturm-Infanteriegeschütz 33B


Brummbär


Panzerjäger I


Marder I ~ III


Jagdpanzer IV


Flakpanzer IV Möbelwagen


Flakpanzer IV Wirbelwind


Flakpanzer IV Ostwind
Reply

Use magic Report

Follow Us
Post time 22-12-2010 05:45 PM | Show all posts
Post Last Edit by ctaz at 22-12-2010 17:48

Italy

Fiat L6/40


Fiat M13/40


Fiat M14/41


M15/42


Carro Armato P 40


Semovente 47/32


Semovente 75/18


Semovente 75/34


Semovente 90/53


Semovente 105/25


AB 41
Reply

Use magic Report

Post time 23-12-2010 09:42 AM | Show all posts
Romania

TACAM T-60


TACAM R-2


Canada

Ram Mk I


Ram Mk II


Australia

Sentinel


Hungary

43M Zrínyi


44M Zrínyi
Reply

Use magic Report


ADVERTISEMENT


Post time 23-12-2010 10:02 AM | Show all posts
Japan

Type 2 Ke-To


Type 1 Chi-He


Type 3 Ka-Chi


Type 1 Ho-Ni I


Type 2 Ho-I


Type 4 Ho-Ro
Reply

Use magic Report

Post time 23-12-2010 10:09 AM | Show all posts
SU-30MKM

















Reply

Use magic Report

Post time 23-12-2010 10:11 AM | Show all posts
DEFTECH









Reply

Use magic Report

Post time 23-12-2010 10:13 AM | Show all posts
PDRM Aset







Reply

Use magic Report

Post time 23-12-2010 10:16 AM | Show all posts
UNIT GEMPUR MARIN









Reply

Use magic Report

Post time 23-12-2010 10:18 AM | Show all posts
APMM















Reply

Use magic Report

Post time 23-12-2010 10:18 AM | Show all posts


Reply

Use magic Report

Post time 23-12-2010 10:27 AM | Show all posts
ASET TLDM

kd tunku abdul rahman


kd tun razak



Name : KD TUNKU ABDUL RAHMAN
              KD TUN RAZAK

Builders : DCN, Cherbourg and Navantia,Cartagena

Laid down : 2 Dec 2003
                         Nov 2004

Launched : 2007
                     2008

Commissioned : Jan 2009
                              Dec 2009

Displcement, tons : 1577 surfaced, 1711 dived

Dimensions, feet (metres) : 217.9 x 20.3 x 17.7
                                                   (66.4 x 6.2 x 5.4)

Main machinery : Diesel electric, 2 SEMT-Pielstick
                                12 PA4 200SM DS diesels,
                                1 Jeumont Industrie motor,
                                4700 hp (3.5 MW), 1 shaft

Speed, knots : 20.5 dived, 12 surfaced

Range, n miles : 360 at 4 kt dived, 6000 at 8 kt
                              surfaced

Complement : 32

Countermeasures : ESM: Thales DR 3000,intercept.

Weapons control : UDS International SUBTICS.

Radars : Navigation: I-band.

Sonars : Hull mounted, active/passive search and
                attack, medium frequency.

Programmes : Contract for the construction of two
                          submarines awarded to Armaris and
                          IZAR on 5 June 2002. A four-year
                          training programme aboard an
                          Agosta-70 (ex-Ouessant) is
                          included in the package. First steel
                          cut for first of class 2 December
                          2003.

Structure : Similar in design to the Chilean boats.
                    Diving depth more than 300 m (984 ft).
                    Options to retrofit AIP at a later date.

Operational : To be based at Sepanggar Naval
                         Base, Sabah.

Source : Jane's Fighting Ships
Reply

Use magic Report


ADVERTISEMENT


Post time 23-12-2010 10:33 AM | Show all posts
Post Last Edit by jofizo at 23-12-2010 10:34

SKN 6 FAC (G)

KD SERANG (3502)


KD GANAS (3503)


KD JERONG (3505)


KD TODAK (3506)


KD PAUS (3507)


KD YU (3508)


KD BAUNG (3509)


KD PARI (3510)


FAST ATTACK CRAFT - GUN

Name : KD SERANG, No Penant : 3502
              KD GANAS, No Penant : 3503

Builders: CMN, Cherbourg

Launched : 22 Dec 1971
                     26 Oct 1972

Commissioned : 31 Jan 1973
                              28 Feb 1973

Displacement, Tons : 234 Standard, 265 full load

Dimension, feet (meters) : 154.2 X 23.1 X 12.8
                                                  ( 47 X 7 X 3.9 )

Main Machinery : 4 MTU MB 870 diesel,
                               14000 hp(m) (10.3 MW),
                               4 shafts

Speed, Knots : 36.5

Range, n miles : 800 at 25 kt, 1800 at 15 kt

Complement : 30 ( 4 officers )

Countermeasures : Decoys: 4 – 57 mm
                                    chaff/flare launchers.
                                    ESM: Thomson-CSF DR 3000,
                                    intercept.

Weapon control : Thomson-CSF Vega Optical
                                for guns.

Radars : Air/Surface search: Thomson-CSF TH-D
               1040 triton, G-band, range 33km
                (18 nmiles) for 2 m2 target.

Navigation : Kelvin Hughes 1007, I-band.

Fire Control : Thomson-CSF Pollux, I/J-band,
                         range 31km (17 n miles)
                         for 2 m2 target.

Programmes : Left Cherbourg for Malaysia
                           2 May 1973.

Modernisation : There are Plans to replace
                             MM 38 with MM40 or Teseo SSMs
                             and to updated radar and EW.

Structure : All Of basic La Combattante II
                    design with steel hulls and
                    aluminium superstructure.

Operational : Form 1st Fast Attack Craft Squadron.

Name : KD JERONG, No Penant : 3505
              KD TODAK, No Penant : 3506
              KD PAUS, No Penant : 3507
              KD YU, No Penant : 3508
              KD BAUNG, No Penant : 3509
              KD PARI, No Penant : 3510

Builders : Hong Leong-Lurssen, Butterworth

Commissioned : 27 Mar 1976
                              16 June 1976
                              16 Aug 1976
                              15 Nov 1976
                              11 Jan 1977
                              23 Mar 1977

Displacement, Tons : 244 full Load

Dimensions, feet(meters) : 147.3 X 23 X 8.3
                                                  (44.9 X 7 X 2.5)

Main Machinery : 3 MTU MB 16V 538TB90 diesel,
                                9000 hp(m) (6.6 MW) sustained,
                                3 shafts

Speed, Knots : 32

Range, n miles : 2000 at 14 kt.

Complement : 36 (4 Officers)

Countermeasures : ESM: Thales DR 3000,
                                    Intercept.

Radars : Surface search: Kelvin Hughes 1007,
                I-band.

Comment : Lurssen 45 type. Illuminant launchers
                     on both gun mountings. Design of hull
                     modification is reported to have been
                     contracted. Form 6th Fast Attack
                     Squadron based at Labuan.

Source : Jane’s Fighting Ships
Reply

Use magic Report

Post time 23-12-2010 10:39 AM | Show all posts
SKN 1 FAC (M)

KD HANDALAN (3511)


KD PERKASA (3512)


KD PENDEKAR (3513)


KD GEMPITA (3514)


KD PERDANA (3501)


KD GANYANG (3504)


FAST ATTACK CRAFT-MISSILE


Name : KD HANDALAN, No Penant : 3511
              KD PERKASA, No Penant : 3512
              KD PENDEKAR, No Penant : 3513
              KD GEMPITA, No Penant : 3514

Builders : Karlskrona, Sweden

Commisioned : 26 Oct 1979

Displacement, Tons : 240 full load

Dimensions, feet (meters) : 142.6 x 23.3 x 7.4
                                                   (screws)
                                                   (43.6 x 7.1 x 2.4)

Main Machinery : 3 MTU 16V 538 TB91 diesel,
                                9180 hp(m) (6.75 MW) sustained,
                                3 shafts

Speed, Knots : 34.5

Range, n miles : 1850 at 14 kt

Complement : 40 (6 officers)

Countermeasures: ESM : Thales DR 3000, intercept.

Weapons Control : 1 PEAB 9LV212 Mk2 weapon
                                  control system with TV tracking.
                                  LME anti-aircraft laser and
                                  TV rangefinfer.

Radars : Surface search : Philips 9GR 600,
                i-band (agile frequency)
                Navigation: Kelvin Hughes 1007
                Fire Control: Philips 9LV 212, J-band.

Programmes : Ordered 15 October 1976.
                          All named in one ceremony on
                          11 November 1978, arriving in
                          port Klang on 26 October 1979.

Modernisation : There are plans to replace the
                             MM 38 with MM40 or Teseo missiles
                             and to updated radar and EW.

Structure : Bridge further forward than in
                    Swedish class to accommodate Exocet.
                    Plans to fit an ASW capability
                    were shelved and the sonar
                    removed.

Operational : Form 2nd Fast Attact Craft Squadron.

Name : KD PERDANA, No Penant : 3501
              KD GANYANG, No Penant : 3504

Builders : CMN, Cherbourg

Launched : 31 May 1972
                     16 Mar 1972

Commissioned : 21 Dec 1972
                              20 Mar 1973

Displacement, Tons : 234 Standard,
                                       265 full load

Dimension, feet (meters) : 154.2 x 23.1 x 12.8
                                                 ( 47 x 7 x 3.9 )

Main Machinery : 4 MTU MB 870 diesel, 14000 hp(m)
                               (10.3 MW), 4 shafts

Speed, Knots : 36.5

Range, n miles : 800 at 25 kt, 1800 at 15 kt

Complement : 30 ( 4 officers )

Countermeasures : Decoys: 4 – 57mm chaff/flare
                                    launchers.
                                    ESM: Thomson-CSF DR 3000,
                                    intercept.

Weapon control : Thomson-CSF Vega Optical for guns.

Radars : Air/Surface search: Thomson-CSF TH-D
               1040 triton, G-band, range 33km
               (18 nmiles) for 2 m2 target.

Navigation : Kelvin Hughes 1007, I-band.

Fire Control : Thomson-CSF Pollux, I/J-band,
                         range 31km (17 n miles)
                         for 2 m2 target.

Programmes : Left Cherbourg for Malaysia
                           2 May 1973.

Modernisation : There are Plans to replace MM 38
                             with MM40 or Teseo SSMs and to
                             updated radar and EW.

Structure : All Of basic La Combattante II design
                    with steel hulls and aluminium
                     superstructure.

Operational : Form 1st Fast Attack Craft Squadron.

Source : Jane’s Fighting Ships
Reply

Use magic Report

Post time 23-12-2010 10:42 AM | Show all posts
SKN 13 PC (SANDAKAN)

KD SRI PERLIS (47)


KD SRI JOHOR (49)
Reply

Use magic Report

Post time 23-12-2010 10:50 AM | Show all posts
SKN 17 PV

KD KEDAH (NO PENANT : 171)


KD PAHANG (NO PENANT : 172)


file:///C:/Users/MOHD%7E1.FAI/AppData/Local/Temp/moz-screenshot.pngKD PERAK (NO PENANT : 173)


KD TERENGGANU (NO PENANT : 174)
file:///C:/Users/MOHD%7E1.FAI/AppData/Local/Temp/moz-screenshot-1.pngfile:///C:/Users/MOHD%7E1.FAI/AppData/Local/Temp/moz-screenshot-2.png

KD KELANTAN (NO PENANT : 175)


KD SELANGOR (NO PENANT : 176)
on building


PATROL VESSEL            
Name : KD KEDAH, No Penant : 171
                        : KD PAHANG, No Penant : 172
                        : KD PERAK, No Penant : 173
                        : KD TERENGGANU, No Penant : 174
                        : KD KELANTAN, No Penant : 175
                        : KD SELANGOR, No Penant : 176
            
Builders : Blohm + Voss/Penang Shipbuilding
                            : Blohm + Voss/Penang Shipbuilding
                            : Boustead Naval Shipyard,Lumut
                            : Boustead Naval Shipyard,Lumut
                            : Boustead Naval Shipyard,Lumut
                            : Boustead Naval Shipyard,Lumut
            
Laid down : 13 Nov 2001
                                : 21 Dec 2001
                                : Mac 2002
                                : Aug 4004
                                : Jul 2005
                                : Jul 2006
            
Launched : 21 Mac 1983
                               : 02 Okt 2003
                               : 2007
                               : 2008
                               : 2008
                               : 2009
            
Commissioned : 05 Jun 2006
                                         : 03 Aug 2006
                                         : 2008
                                         : 2009
                                         : 2010
                                         : 2010
            
Displacement, tons : 1650 full load            
Dimensions, feet(metres) : 298.9 x 39.4 x 9.8            
Main machinery : 2 Caterpillar 3616 diesel,
                                            total of 14617 hp(m)
                                            (10.9 MW) sustained, 2 shafts,
                                            cp propellors
            
Speed, Knots : 22. Range, n miles: 6050 at 12kt            
ComplemenT : 68 (11 0fficers)            
Radars : Air/surface search: TRS-3D/16ES; G-band.            
Sonars : Fitted for.            
Helicopters : Platform for medium helicopter.            
Programmes : Following a delay of 19 months
                                       since initial signature,
                                       the Malaysian government, the
                                       Penang Shipbuilding
                                       Corporation and German Naval
                                       Group comsortium
                                       (led by Blohm + Voss) reached
                                       final agreement in
                                       November 2000 for the supply of
                                       an initial batch of six vessels.
                                       The first two OPVs were built in
                                       Germany for Shipment to Malaysia
                                       and assembly and fitting out at
                                       Lumut. The first ship left
                                       Hamburg on 1 April 2003 and the
                                       second ship on 6 october 2003.
                                       Subsequent ship under contruction
                                       in Malaysia.However, the
                                       programme has been plagued by
                                       technical problems and quality
                                       control issues and, following
                                       the reversion of PSC to state
                                       control by September 2005, a new
                                       management team was put in place.
                                       The third and fourth units were
                                       under consideration in late 2006
                                       and work on the hulls of the
                                       fifth and six units had started.
                                       However, the conctruction
                                       programme is speculative.
            
Structure : Design based on Blohm + Voss MEKO
                                100 including measures
                                to reduce the radar and IR
                                signatures.Space has been include
                                SSM, SAM, sonar and EW suite.
            
Operational : Principal tasks are expected to be
                                     maritime surveilliance and patrol
                                     duties in the Malaysians EEZ.
                                     The first two are to be
                                     based at Sepanggar.
            
Source : Jane's Fighting Ships
Reply

Use magic Report

You have to log in before you can reply Login | Register

Points Rules

 

Category: Gambar & Video


ADVERTISEMENT


Forum Hot Topic

 

ADVERTISEMENT


 


ADVERTISEMENT
Follow Us

ADVERTISEMENT


Mobile|Archiver|Mobile*default|About Us|CARI Infonet

25-4-2024 02:14 PM GMT+8 , Processed in 0.145074 second(s), 41 queries .

Powered by Discuz! X3.4

Copyright © 2001-2021, Tencent Cloud.

Quick Reply To Top Return to the list