CARI Infonet

 Forgot password?
 Register

ADVERTISEMENT

View: 518|Reply: 0

[Accesories & Hobbies] Australian conveyor manufacturers purchase 20 ton overhead cranes from China

[Copy link]
Post time 29-11-2021 11:00 AM | Show all posts |Read mode
Before sharing this case, the first thing to be clear is that if the lifting capacity of the crane exceeds 10 tons, it needs to be registered with the authority when entering Australia. However, when entering Australia, we will provide the required documents, such as production drawings, electrical drawings, etc.
Case of 20 ton overhead crane in Australia

The case to be shared today is a conveyor manufacturer from Canberra, Australia. Its main fields include designing and manufacturing conveyors for mines, ports and other large bulk material processing plants. When the customer communicated with us in the early stage, the parameters sent to us were very detailed, so the communication would be much easier. As this is the first cooperation, customers doubt whether we have the experience of exporting cranes to Australia. For this, our account manager said that on the one hand, the biggest problem of cranes exported to Australia is only the need to register cranes with a lifting capacity of more than 10 tons. On the other hand, we have cases of other Australian customers for customers to query and verify our strength. After several days of communication and contact, we finally gained the trust of our customers and were told that we had been added to the list of suppliers.

After that, in addition to some minor differences on the payment method, the customer put forward some additional questions about FAT test (factory acceptance test), and we also answered them one by one.

20 ton overhead crane sale to Australia Crane for sale

Description of FAT test of overhead crane

Fat (factory acceptance test) is short for factory acceptance test. Fat includes specified system function test, stability test and availability test. Fat shall be carried out at the time determined by both parties at the design liaison meeting.

  • During fat, the Seller shall provide necessary equipment for detection, maintenance, measurement, test and record.
  • During fat, the Seller shall provide all site facilities and simulated site environment.
  • The Seller shall be responsible for the installation and commissioning of the system.
  • Both the buyer and the Seller shall send experienced engineers to participate in fat.
Australian conveyor manufacturers purchase 20 ton overhead cranes from China

Reply

Use magic Report

You have to log in before you can reply Login | Register

Points Rules

 

ADVERTISEMENT


Forum Hot Topic

 

ADVERTISEMENT


 


ADVERTISEMENT
Follow Us

ADVERTISEMENT


Mobile|Archiver|Mobile*default|About Us|CARI Infonet

29-3-2024 10:26 PM GMT+8 , Processed in 0.052819 second(s), 26 queries .

Powered by Discuz! X3.4

Copyright © 2001-2021, Tencent Cloud.

Quick Reply To Top Return to the list