|
ASET TLDM
kd tunku abdul rahman
kd tun razak
Name : KD TUNKU ABDUL RAHMAN
KD TUN RAZAK
Builders : DCN, Cherbourg and Navantia,Cartagena
Laid down : 2 Dec 2003
Nov 2004
Launched : 2007
2008
Commissioned : Jan 2009
Dec 2009
Displcement, tons : 1577 surfaced, 1711 dived
Dimensions, feet (metres) : 217.9 x 20.3 x 17.7
(66.4 x 6.2 x 5.4)
Main machinery : Diesel electric, 2 SEMT-Pielstick
12 PA4 200SM DS diesels,
1 Jeumont Industrie motor,
4700 hp (3.5 MW), 1 shaft
Speed, knots : 20.5 dived, 12 surfaced
Range, n miles : 360 at 4 kt dived, 6000 at 8 kt
surfaced
Complement : 32
Countermeasures : ESM: Thales DR 3000,intercept.
Weapons control : UDS International SUBTICS.
Radars : Navigation: I-band.
Sonars : Hull mounted, active/passive search and
attack, medium frequency.
Programmes : Contract for the construction of two
submarines awarded to Armaris and
IZAR on 5 June 2002. A four-year
training programme aboard an
Agosta-70 (ex-Ouessant) is
included in the package. First steel
cut for first of class 2 December
2003.
Structure : Similar in design to the Chilean boats.
Diving depth more than 300 m (984 ft).
Options to retrofit AIP at a later date.
Operational : To be based at Sepanggar Naval
Base, Sabah.
Source : Jane's Fighting Ships |
|
|
|
|
|
|
|
Post Last Edit by jofizo at 23-12-2010 10:34
SKN 6 FAC (G)
KD SERANG (3502)
KD GANAS (3503)
KD JERONG (3505)
KD TODAK (3506)
KD PAUS (3507)
KD YU (3508)
KD BAUNG (3509)
KD PARI (3510)
FAST ATTACK CRAFT - GUN
Name : KD SERANG, No Penant : 3502
KD GANAS, No Penant : 3503
Builders: CMN, Cherbourg
Launched : 22 Dec 1971
26 Oct 1972
Commissioned : 31 Jan 1973
28 Feb 1973
Displacement, Tons : 234 Standard, 265 full load
Dimension, feet (meters) : 154.2 X 23.1 X 12.8
( 47 X 7 X 3.9 )
Main Machinery : 4 MTU MB 870 diesel,
14000 hp(m) (10.3 MW),
4 shafts
Speed, Knots : 36.5
Range, n miles : 800 at 25 kt, 1800 at 15 kt
Complement : 30 ( 4 officers )
Countermeasures : Decoys: 4 – 57 mm
chaff/flare launchers.
ESM: Thomson-CSF DR 3000,
intercept.
Weapon control : Thomson-CSF Vega Optical
for guns.
Radars : Air/Surface search: Thomson-CSF TH-D
1040 triton, G-band, range 33km
(18 nmiles) for 2 m2 target.
Navigation : Kelvin Hughes 1007, I-band.
Fire Control : Thomson-CSF Pollux, I/J-band,
range 31km (17 n miles)
for 2 m2 target.
Programmes : Left Cherbourg for Malaysia
2 May 1973.
Modernisation : There are Plans to replace
MM 38 with MM40 or Teseo SSMs
and to updated radar and EW.
Structure : All Of basic La Combattante II
design with steel hulls and
aluminium superstructure.
Operational : Form 1st Fast Attack Craft Squadron.
Name : KD JERONG, No Penant : 3505
KD TODAK, No Penant : 3506
KD PAUS, No Penant : 3507
KD YU, No Penant : 3508
KD BAUNG, No Penant : 3509
KD PARI, No Penant : 3510
Builders : Hong Leong-Lurssen, Butterworth
Commissioned : 27 Mar 1976
16 June 1976
16 Aug 1976
15 Nov 1976
11 Jan 1977
23 Mar 1977
Displacement, Tons : 244 full Load
Dimensions, feet(meters) : 147.3 X 23 X 8.3
(44.9 X 7 X 2.5)
Main Machinery : 3 MTU MB 16V 538TB90 diesel,
9000 hp(m) (6.6 MW) sustained,
3 shafts
Speed, Knots : 32
Range, n miles : 2000 at 14 kt.
Complement : 36 (4 Officers)
Countermeasures : ESM: Thales DR 3000,
Intercept.
Radars : Surface search: Kelvin Hughes 1007,
I-band.
Comment : Lurssen 45 type. Illuminant launchers
on both gun mountings. Design of hull
modification is reported to have been
contracted. Form 6th Fast Attack
Squadron based at Labuan.
Source : Jane’s Fighting Ships |
|
|
|
|
|
|
|
SKN 1 FAC (M)
KD HANDALAN (3511)
KD PERKASA (3512)
KD PENDEKAR (3513)
KD GEMPITA (3514)
KD PERDANA (3501)
KD GANYANG (3504)
FAST ATTACK CRAFT-MISSILE
Name : KD HANDALAN, No Penant : 3511
KD PERKASA, No Penant : 3512
KD PENDEKAR, No Penant : 3513
KD GEMPITA, No Penant : 3514
Builders : Karlskrona, Sweden
Commisioned : 26 Oct 1979
Displacement, Tons : 240 full load
Dimensions, feet (meters) : 142.6 x 23.3 x 7.4
(screws)
(43.6 x 7.1 x 2.4)
Main Machinery : 3 MTU 16V 538 TB91 diesel,
9180 hp(m) (6.75 MW) sustained,
3 shafts
Speed, Knots : 34.5
Range, n miles : 1850 at 14 kt
Complement : 40 (6 officers)
Countermeasures: ESM : Thales DR 3000, intercept.
Weapons Control : 1 PEAB 9LV212 Mk2 weapon
control system with TV tracking.
LME anti-aircraft laser and
TV rangefinfer.
Radars : Surface search : Philips 9GR 600,
i-band (agile frequency)
Navigation: Kelvin Hughes 1007
Fire Control: Philips 9LV 212, J-band.
Programmes : Ordered 15 October 1976.
All named in one ceremony on
11 November 1978, arriving in
port Klang on 26 October 1979.
Modernisation : There are plans to replace the
MM 38 with MM40 or Teseo missiles
and to updated radar and EW.
Structure : Bridge further forward than in
Swedish class to accommodate Exocet.
Plans to fit an ASW capability
were shelved and the sonar
removed.
Operational : Form 2nd Fast Attact Craft Squadron.
Name : KD PERDANA, No Penant : 3501
KD GANYANG, No Penant : 3504
Builders : CMN, Cherbourg
Launched : 31 May 1972
16 Mar 1972
Commissioned : 21 Dec 1972
20 Mar 1973
Displacement, Tons : 234 Standard,
265 full load
Dimension, feet (meters) : 154.2 x 23.1 x 12.8
( 47 x 7 x 3.9 )
Main Machinery : 4 MTU MB 870 diesel, 14000 hp(m)
(10.3 MW), 4 shafts
Speed, Knots : 36.5
Range, n miles : 800 at 25 kt, 1800 at 15 kt
Complement : 30 ( 4 officers )
Countermeasures : Decoys: 4 – 57mm chaff/flare
launchers.
ESM: Thomson-CSF DR 3000,
intercept.
Weapon control : Thomson-CSF Vega Optical for guns.
Radars : Air/Surface search: Thomson-CSF TH-D
1040 triton, G-band, range 33km
(18 nmiles) for 2 m2 target.
Navigation : Kelvin Hughes 1007, I-band.
Fire Control : Thomson-CSF Pollux, I/J-band,
range 31km (17 n miles)
for 2 m2 target.
Programmes : Left Cherbourg for Malaysia
2 May 1973.
Modernisation : There are Plans to replace MM 38
with MM40 or Teseo SSMs and to
updated radar and EW.
Structure : All Of basic La Combattante II design
with steel hulls and aluminium
superstructure.
Operational : Form 1st Fast Attack Craft Squadron.
Source : Jane’s Fighting Ships |
|
|
|
|
|
|
|
SKN 13 PC (SANDAKAN)
KD SRI PERLIS (47)
KD SRI JOHOR (49)
|
|
|
|
|
|
|
|
SKN 17 PV
KD KEDAH (NO PENANT : 171)
KD PAHANG (NO PENANT : 172)
file:///C:/Users/MOHD%7E1.FAI/AppData/Local/Temp/moz-screenshot.pngKD PERAK (NO PENANT : 173)
KD TERENGGANU (NO PENANT : 174)
file:///C:/Users/MOHD%7E1.FAI/AppData/Local/Temp/moz-screenshot-1.pngfile:///C:/Users/MOHD%7E1.FAI/AppData/Local/Temp/moz-screenshot-2.png
KD KELANTAN (NO PENANT : 175)
KD SELANGOR (NO PENANT : 176)
on building
PATROL VESSEL
Name : KD KEDAH, No Penant : 171
: KD PAHANG, No Penant : 172
: KD PERAK, No Penant : 173
: KD TERENGGANU, No Penant : 174
: KD KELANTAN, No Penant : 175
: KD SELANGOR, No Penant : 176
Builders : Blohm + Voss/Penang Shipbuilding
: Blohm + Voss/Penang Shipbuilding
: Boustead Naval Shipyard,Lumut
: Boustead Naval Shipyard,Lumut
: Boustead Naval Shipyard,Lumut
: Boustead Naval Shipyard,Lumut
Laid down : 13 Nov 2001
: 21 Dec 2001
: Mac 2002
: Aug 4004
: Jul 2005
: Jul 2006
Launched : 21 Mac 1983
: 02 Okt 2003
: 2007
: 2008
: 2008
: 2009
Commissioned : 05 Jun 2006
: 03 Aug 2006
: 2008
: 2009
: 2010
: 2010
Displacement, tons : 1650 full load
Dimensions, feet(metres) : 298.9 x 39.4 x 9.8
Main machinery : 2 Caterpillar 3616 diesel,
total of 14617 hp(m)
(10.9 MW) sustained, 2 shafts,
cp propellors
Speed, Knots : 22. Range, n miles: 6050 at 12kt
ComplemenT : 68 (11 0fficers)
Radars : Air/surface search: TRS-3D/16ES; G-band.
Sonars : Fitted for.
Helicopters : Platform for medium helicopter.
Programmes : Following a delay of 19 months
since initial signature,
the Malaysian government, the
Penang Shipbuilding
Corporation and German Naval
Group comsortium
(led by Blohm + Voss) reached
final agreement in
November 2000 for the supply of
an initial batch of six vessels.
The first two OPVs were built in
Germany for Shipment to Malaysia
and assembly and fitting out at
Lumut. The first ship left
Hamburg on 1 April 2003 and the
second ship on 6 october 2003.
Subsequent ship under contruction
in Malaysia.However, the
programme has been plagued by
technical problems and quality
control issues and, following
the reversion of PSC to state
control by September 2005, a new
management team was put in place.
The third and fourth units were
under consideration in late 2006
and work on the hulls of the
fifth and six units had started.
However, the conctruction
programme is speculative.
Structure : Design based on Blohm + Voss MEKO
100 including measures
to reduce the radar and IR
signatures.Space has been include
SSM, SAM, sonar and EW suite.
Operational : Principal tasks are expected to be
maritime surveilliance and patrol
duties in the Malaysians EEZ.
The first two are to be
based at Sepanggar.
Source : Jane's Fighting Ships |
|
|
|
|
|
|
| |
|